Image Alt
What we’re working on

Recent Projects

The latest and greatest from C.A. Hull

Check out our
latest projects

I-75 & M-46 in Saginaw

  • Total Project Investment: $62 million
  • Location: Saginaw County, MI

This $62 million, multi-year, design-build project involved 2.4 miles of reconstruction and widening on I-75, reconstruction of M-46 and the I-75/M-46 interchange, and replacing structures at M-46 over I-75 and at I-75 over the LSRC/CSX railroad in Saginaw County. During...

I-94 in Jackson County

  • Total Project Investment: $110 million
  • Location: Jackson County, MI

The $110-million design-bid-build project began in the summer of 2018 and included repairing and expanding several areas of the highway as well as replacing two mainline bridges, one overpass bridge, and reconstructing the Cooper Street interchange. C.A. Hull engineers were...

M-55 over Pine River

  • Total Project Investment: $4 million
  • Location: Manistee, MI

This historic preservation project of the Mortimer E. Cooley Bridge in Manistee, MI. involved rehabilitation and preventive maintenance the structure. Constructed in 1934, the MEC Bridge is one of the only two cantilevered deck truss bridges in Michigan. The bridge...

Chene & Gratiot Avenue over I-94

  • Total Project Investment: $23 million
  • Location: Detroit, MI

This design-bid-build project consisted of the reconstruction of two structures and the removal of three pedestrian bridges in Detroit, MI. C.A. Hull was responsible for all demolition of existing structures and bridge reconstruction. Our project team was also responsible for...

8 Structures on I-75

  • Total Project Investment: $115 million
  • Location: Monroe County, MI

This design-bid-build project consisted of work on eight bridges on northbound and southbound I-75 from the Ohio state line to Erie Road in Monroe County, MI. C.A. Hull’s project team reconstructed six of the eight structures and provided rehabilitation work...