We are proud of our work history
2004 – 2006
Blue Arches over Telegraph
- Total Project Investment: $67 million
- Location: Taylor, MI
C.A. Hull was contracted to construct what is known as the Gateway Bridge in Taylor, MI because it acts as the “gateway to Detroit” for those traveling on I-94 from Detroit Metropolitan Wayne County Airport. It was developed by the...
2013 – 2015
M-231 over Grand River
- Total Project Investment: $59 million
- Location: Ottawa County, MI
This project included a new 1,277’ long, 16-span structure on M-231 over the Grand River in Ottawa County, which is the 6th largest bridge in Michigan. Work on this project included a temporary haul road allowing the C.A. Hull/Hardman joint...
2014
I-96 Reconstruction
- Total Project Investment: $149 million
- Location: Livonia and Redford Township, MI
Winner of Engineering News Record’s Midwest “Best Highway/Bridge Project” in 2015, the “96fix” project was a complete reconstruction of seven miles of I-96 performed under a full freeway closure from just east of I-275 to US-24. The project included widening...
2016 – 2017
I-75 at Square Lake
- Total Project Investment: $89 million
- Location: Bloomfield Township, MI
The goal of the I-75 Modernization Project was to improve the freeway from M-102 to south of M-59 in three segments. Segment 1 of the project was 2.69 miles in length and included pavement replacement with the addition of an...
2017 – 2018
I-75 over Rouge River
- Total Project Investment: $154 million
- Location: Detroit, MI
This landmark project included deck replacements on I-75 over Fort Street and the Rouge River, bridge rehabilitation on 6 structures, and the reconstruction of northbound I-75 over the Sexton and Kilfoil Drain. Work on this project was completed in three...
2001 – 2003
M-6 & US-131 Interchange
- Total Project Investment: $134 million
- Location: Ottawa and Kent County, MI
This landmark project was a tri-venture to construct the new M-6 Corridor in Ottawa and Kent Counties. The new corridor consisted of 21 new bridges, two box culverts, 75,000 square feet of cast-in-place retaining walls, and 35,430 square feet of...
2014
US-131 over 3 Mile
- Total Project Investment: $4 million
- Location: Morley, MI
This landmark project consisted of the first bridge superstructure replacement by lateral slide for both C.A. Hull and MDOT. The goal of the lateral slide was to accelerate bridge construction and reduce the amount of time traffic is impacted. Both...
2011 – 2012
I-94/I-69 over Black River
- Total Project Investment: $89 million
- Location: Port Huron, MI
This landmark project involved the replacement of three structures on I-69/I-94 over the Black River in Port Huron, MI. The project also included 2.13 miles of freeway reconstruction, interchange reconstruction at two interchanges, ramp connections at the maintenance garage and...